
Latin America
Structural Engineering Services in Brazil
Every engineering discipline your Brazil project needs — designed to AISC 360, ASCE 7, NSR-10 and delivered with overnight production so drawings are ready at start of day.
Quick answer
Structural Engineering Services serves clients in Brazil with 60+ engineering services, working to AISC 360, ASCE 7, NSR-10, ASME B31.3, API 650. Key sectors: Mining, Oil & Gas, Energy, Industrial.
Design basis
Codes, standards & units for Brazil
Drawings that arrive in the wrong convention cost days on the shop floor. Here is exactly what we design and draft to for Brazil.
| Standard | Discipline | How we apply it |
|---|---|---|
| AISC 360 | Structural steel | Member, connection and stability design for frames, racks and platforms |
| ASCE 7 | Loads | Wind, seismic, snow and load-combination basis for every analysis model |
| NSR-10 | Loads & seismic | Seismic-resistant construction requirements for the region |
| ASME B31.3 | Process piping | Wall thickness, flexibility and CAESAR II stress acceptance |
| API 650 | Storage tanks | Welded tank shells, annular plates, roofs and appurtenances |
Units on Brazil jobs
metric
Metric throughout — millimetres on drawings, metres for levels and setting out, kilonewtons and megapascals in the calculations.
What lands in your folder
Native Tekla, STAAD.Pro, CAESAR II and PV-Elite files plus PDF, DWG, DXF, NC1/DSTV and IFC.
Drawing conventions your fabricator expects
- Sheets & scales
- ISO A1 / A3 sheets, or ANSI D where the EPC is US-based
- Dimensions
- Millimetres, with imperial callouts where US rolled sections are used
- Steel grades
- ASTM A36 / A572 Gr.50, with local equivalents cross-referenced
- Bolting
- ASTM F3125 Gr. A325 / A490 with washer and tensioning notes
- Welding
- AWS D1.1 weld symbols, bilingual notes on request
- Projection
- Third-angle projection with project grid and datum
How we work with you
A working day with your Brazil team
Nothing about this is improvised. Brazil is 8 h 30 m behind our engineering desk (UTC+05:30), so we run a fixed daily rhythm around your working hours in Brazil.
Clock positions use standard time for Brazil; daylight saving shifts the band by one hour for part of the year.
4 h 30 m
Our extended shift covers 09:00–13:30, Brazil time
< 4 working hours
Answered during our extended shift, before you log off
Weekly + daily log
A recorded model walkthrough you watch on your clock, plus a daily written log
09:00
1. Overnight drop is waiting
Models, drawings and calculation updates produced while Brazil was closed are already in the shared folder when your day starts.
09:00–13:30
2. Extended-desk window
A senior engineer holds an extended shift so Brazil can take calls and close RFIs live rather than by email.
17:30
3. You hand off
Mark up the drawings, raise RFIs and set the next priority before you log off. The queue is picked up at the start of our next shift.
Next 09:00
4. Revisions back
Comments closed, revision clouds in place and the next issue in your folder before the first Brazil meeting of the day.
Sector focus
Industries & project types in Brazil
The work that reaches us from Brazil clusters around four sectors. These are the packages we are asked for most.
Heavy, abrasive-duty structures built far from anywhere — so the drawings have to be right first time.
- Conveyor galleries and trestles
- Transfer towers and chutes
- Silos, bins and hoppers
- Crusher and mill building steel
Upstream, midstream and downstream packages for operators, EPCs and the fabricators who build for them.
- Separator & metering skids
- Pipe racks and process structures
- B31.3 stress packages
- Wellhead and compressor modules
Generation and transmission assets where equipment loads drive both the structure and the foundations.
- Power-block and BOP structures
- Steam and condensate stress analysis
- Tank farms and terminal steel
- Switchyard and substation frames
Production and logistics facilities where tonnage economy and erection speed decide the bid.
- PEB and heavy industrial sheds
- Crane gantries and runway beams
- Mezzanines, platforms and stairs
- Equipment support structures
Commercial & compliance
Contracting, IP and invoicing for Brazil
Engineering is the easy part of an offshore engagement — the contract, the IP and the invoice are what stall it. Here is how we set those up for Brazil clients.
Fixed-price package
Quote in 24 h · 2–4 milestonesBest for: A defined scope — one building, one skid, one vessel
Lump sum against an agreed drawing and tonnage list. Milestone invoicing, and change orders only for scope you approve in writing.
Rate-based delivery
Weekly reporting · monthly invoiceBest for: Scope that is still moving
Per-drawing, per-tonne or per-hour rates fixed up front, with a weekly burn and progress report so the invoice never surprises you.
Dedicated engineers (ODC)
Monthly per seat · 1-month noticeBest for: A continuous workload across many projects
Named engineers reserved for you each month, working in your folder structure, templates and drawing standards under your team lead.
The paperwork, up front
Working with SES from Brazil
- Invoicing currency
- BRL or USD, fixed at contract stage
- Payment terms
- Milestone or monthly invoicing, net 30 days from invoice
- Contract vehicle
- NDA, then a master services agreement with a priced scope schedule per package
- IP & ownership
- Models, drawings, calculations and native files transfer to you on final payment
- Cross-border paperwork
- Tax-residency and invoice documentation supplied for Brazil finance and treaty relief
- Insurance
- Professional indemnity cover; certificate issued with the proposal on request
Local practice: Bilingual title blocks and drawing notes on request, with documentation structured for EPC and owner review gates.
Confidentiality, IP & data security
- Mutual NDA signed before drawings are exchanged — usually inside one working day.
- All models, drawings, calculations and native files become your property on final payment.
- Project data lives in access-controlled folders; only the named team on your job can open them.
- No sub-contracting of your scope to a third party without your written consent.
- Every deliverable is produced on genuine licensed software, so your submission chain stays clean.
- Transfers over your portal, SharePoint, or our encrypted link — whichever your IT policy allows.
Coverage
Delivered everywhere in Brazil
We work remotely, so there is no travel premium and no gap in coverage between Brazil's industrial centres.
- Work is delivered remotely from our engineering office: overnight production so drawings are ready at start of day.
- No travel premium, no minimum project size, and the same senior review on every package.
Cities we serve across Brazil
Each has its own page with the same code basis and delivery rhythm.
Neighbouring Latin America markets
Same team, same codes — useful when a project crosses a border.
Directory
Every service we deliver in Brazil
Open a discipline to see the exact scope you need. Each page sets out deliverables, the codes we work to in Brazil and a typical turnaround.
62 services
Steel Structures & Detailing in Brazil
20
Tekla-based 3D modeling and fabrication-ready steel detailing for every structure type.
- Steel Detailing Services in Brazil
- Structural Steel Detailing in Brazil
- Tekla 3D Modeling in Brazil
- Fabrication & Shop Drawings in Brazil
- Steel Erection Drawings in Brazil
- BOQ & Material Take-off in Brazil
- Pre-Engineered Building (PEB) Design in Brazil
- Industrial Building Design in Brazil
- Commercial Building Steel Design in Brazil
- Pipe Rack Design in Brazil
- Equipment Support Structures in Brazil
- Offshore Platform Structures in Brazil
- Transmission Tower Design in Brazil
- Communication Tower Design in Brazil
- Steel Staircase & Handrail Design in Brazil
- Factory Shed Design in Brazil
- Storage Tank Dome Roof Design in Brazil
- Long-Span Roof Structures in Brazil
- Process Plant Structures in Brazil
- Loading Ramps & Industrial Platforms in Brazil
Structural Analysis & Design in Brazil
8
Code-compliant analysis, member design, connection and foundation design.
Piping Design & Stress in Brazil
10
3D piping, layouts, isometrics and CAESAR II stress analysis for process plants.
- Piping Design Services in Brazil
- Pipe Stress Analysis in Brazil
- CAESAR II Stress Analysis in Brazil
- CADWorx 3D Piping Modeling in Brazil
- Piping Isometric Drawings in Brazil
- Piping Layout & Routing in Brazil
- Pipe Support Design in Brazil
- Piping Thickness Calculation in Brazil
- Valve Datasheets & Piping BOM in Brazil
- Piping Spool Fabrication Drawings in Brazil
Static Equipment Design in Brazil
10
Mechanical design of pressure vessels, heat exchangers, tanks and stacks.
- Pressure Vessel Design in Brazil
- PV-Elite Vessel Design in Brazil
- ASME Section VIII Design in Brazil
- Heat Exchanger Mechanical Design in Brazil
- Storage Tank Design (API 650) in Brazil
- Silo, Bin & Hopper Design in Brazil
- Chimney & Stack Design in Brazil
- Reactor & Jacketed Vessel Design in Brazil
- Separator & Scrubber Design in Brazil
- Static Equipment Design in Brazil
Skid Package Engineering in Brazil
4
Complete design of modular skids — vessel, piping, structure and lifting.
Finite Element Analysis in Brazil
5
Advanced simulation on ANSYS Mechanical Enterprise for critical components.
CAD, BIM & Drafting in Brazil
5
Detail engineering, BIM modeling and model reviews across all disciplines.
Start your project
Send your drawings. Get a quote in 24 hours.
Free, no-obligation proposal from a senior engineer.